Project

STEAM PLANT

Modelling and coordination of pipework systems for a steam plant, guided by P&ID and material specifications/piping class. The project included spooling and installation drawings and modelling of equipment according to cutsheets and submittals.

portada
02

Project overview

Pipework System Modelling: Focused on the detailed modelling of pipework systems specific to a steam plant.

Guidance by P&ID and Specifications: Adhered to Process & Instrumentation Diagrams (P&IDs) and material specifications/piping class for accuracy and compliance.

Spooling and Installation Drawings: Developed precise spooling and installation drawings as part of the project's deliverables.

Equipment Modelling: Executed the modelling of equipment based on cutsheets and submittals, ensuring alignment with the overall project requirements.

My rol

As a BIM Specialist, my responsibilities blend precision and collaboration:

Pipework Modelling and Coordination: I meticulously model and coordinate pipes in line with P&IDs, isometrics, and valve schedules, ensuring every detail aligns perfectly.

Fabrication Parts Database Management: I set up and manage the Fabrication Parts Database, tailoring it to align with specific material specifications.

Coordination Meetings and Clash Resolution: Actively participating in coordination meetings, I focus on identifying and resolving clashes, ensuring smooth project progression.

Detailed Spool and Installation Drawings: I specialize in creating detailed spool maps, spool sheets, and installation drawings, contributing to the clarity and accuracy of the fabrication process.

Equipment Modeling: Utilizing cutsheets, I model equipment as RFA files, integrating them seamlessly into the overall BIM framework.

Tools

Revit Naviskworks MSuite Fabrication CadMEP BlueBeam ACC (Docs) Spreadsheets Notion

Challenges

Existing Conditions as Constraints: Being a plant expansion project, certain pre-existing conditions posed limitations.

Mid-Project Adjustments: Three months into the project, deviations were discovered, necessitating a second scanning and re-coordination effort.

Spool Definition Criteria: Initially, the criteria for defining spools were not clearly established. My team identified handling conditions that required cutting some spools for effective management.

If you would like to know more about my involvement in this challenging project, please do not hesitate to contact me via LinkedIn.

Also, please note that the graphic content presented respects all confidentiality agreements and is password protected to ensure its proper use. Thank you very much for your understanding.